Corey

3/2/2015
Los Angeles, CA

Position Desired

Industrial Engineering
Los Angeles, CA; Anywhere in DC; Philadelphia, PA
Yes

Resume

EDUCATION & CERTIFICATIONS
Cornell University, College of Engineering, Ithaca, NY
B.S. Operations Research and Industrial Engineering, January 2009
USC Viterbi College of Engineering, Los Angeles, CA
Six Sigma Green Belt Certification, June 2014
Accenture Workforce Optimization Academy
MOST Certification, September 2014

RELATED EXPERIENCE
Industrial Engineer
May 2013 – present
Wallenius Wilhelmsen Logistics, Los Angeles, CA
Job Description:
As an Industrial Engineer for Nissan’s 3PL, WWL, I am responsible for optimizing the logistics of importing, customizing, and distributing over 100,000 vehicles per year, worth $3.5 billion. During my time as the sole IE overseeing WWL’s sites at the Port of LA and Port Hueneme, I have lead several major kaizen workshops and driven continuous improvement activities resulting in over $1.5 million in cost savings. Last year, I was honored to receive the global Castor Green Award for environmental stewardship after submitting a cost benefit analysis to WWL’s corporate headquarters to justify an LED lighting retrofit project at the Port of LA.
Responsibilities:
-Support global deployment of ISO-compliant “Way of Working” by leading Process Excellence training on PDCA cycle and Lean manufacturing for all employees at West Coast sites. Perform regular audits on California sites to ensure compliance.
-Drive continuous improvement activities to meet company cost savings target. Recent major initiative was to re-arrange Accessory Shop into U-Line, balance cell staffing, enable pull production, and implement in-process quality checks, resulting in 60% reduction in defects, 30% increase in labor efficiency, $500,000 cost savings.
-Complete time studies to develop standard rates for all new programs and validate existing rates for all billing activities. Communicate with Nissan to ensure mutual benefit and understanding. Manage Document Control of all supporting time studies in SharePoint.
-Champion WWL value of environmental stewardship. Oversaw completion of LED retrofit resulting in 92% energy reduction and $30,000 savings per year. Developed shade tree planting schematic for office for natural climate control. Organized employee tree adoption.

Industrial Engineer II
August 2011 – May 2013
The Boeing Company, North Charleston, SC
Job Description:
As the Interiors Lead for Industrial Engineering on the Charleston 787 Program, I was responsible for supporting Manufacturing operations by providing production schedules for aircraft Interior installations for a multitude of customer configurations. As the Lean focal for my team, I also frequently lead and participated in kaizen workshops to support factory-wide continuous improvement.
Responsibilities:
-Oversee Interiors IEs in modeling and maintenance of precedence networks and production schedules for five installation teams using Aurora constraint-based scheduling software to account for resource and budget availability
-Collaborate daily with Manufacturing Engineering, Manufacturing Managers, and Materials Management to assess and mitigate performance to plan
-Create and status recovery plans as necessary based on performance metrics and forecasted risk to production schedule using COGNOS and Aurora
-Perform work sampling and time studies on manufacturing operations using WorkStudy+ to validate scheduled durations and identify opportunities for process improvement. Chosen by the Interiors Responsibility Center for special assignment performing work measurement on Interiors fabrication process
-Training completed for Lean Leader in Accelerated Improvement and Value Stream Mapping Workshops. Led two workshops mentored by Shingijutsu consultants. Participated as auditee in successful Lean Manufacturing Assessment.

Industrial Engineering Assistant
January 2011 – July 2011
TJX Companies, Marshalls Distribution Center, Philadelphia, PA
Job Description:
As a member of the Industrial Engineering Department, I was responsible for implementing the Engineered Standards Program. The goal of the program was to model warehouse job functions in order to track and improve company profitability.
Responsibilities:
-Validated job performance standards based on the MOST work measurement system through time studies and pace rating observations on the warehouse floor
-Performed work samplings in order to calculate frequencies to model delay due to seasonality, equipment failure, operational layout, and other factors
-Maintained and updated Red Prairie Warehouse Management System software and filing system to incorporate all changes per observations

Production Manager
January 2010 - July 2010
MiTeGen, LLC, Ithaca, NY
Job Description:
In January 2010, I was promoted to Production Manager at the biotech manufacturing company, MiTeGen. I took on the responsibility of managing the company's material requir...

Login or Register to view the full resume.