hurmain

5/2/2014
Unknown

Position Desired

Process Engineering
Karachi, ND
No

Resume

ASYNOPSIS

 Over five years of experience in EPCM firms executing major projects in refining, gas processing (both Onshore & Offshore).
 Experience in handling licensor, open arts and revamp FEED projects, conceptual process studies and detailed engineering projects.
 Strong simulation skills and proficient in use of common hydrocarbon industry simulators HYSYS.
 Experience in all aspects of process package development including heat and material balance generation, preparing engineering drawings, equipment design and data sheets, hydraulic studies, leading client drawings and HAZOP reviews and technical document writing.
 Experience in crude oil refinery operations.
 Excellent networking skills with exposure to client interaction and inter discipline and inter office interaction.

PROFESSIONAL EXPERIENCE

Worley Parsons Abu Dhabi, U.A.E
Process Engineer July 2008 – Present


 Working as a process engineer on Gas Pipeline/Offshore/Gas processing projects.
 GASCO Hydrocarbon Acid Gas Flare Recovery Project
• GASCO (Abu Dhabi Gas Company) awarded WorleyParsons, the FEED of Acid Gas Recovery from their Gas Plant operating in Habshan as Habshan 1,2,3 and 4.
• Performed site visits and collected data to have a head start.
• Performed HYSYS simulations.
• Extensively used FlareNet to check the back pressure on existing instruments / equipments due to additional facilities.
• Establish the acid gas recovery scheme.
• Report writing.
• Took part in HAZOP.
 ADMA OPCO Compressor Adequacy Check
• As a sequential of 100 MBD FEED project ADMA OPCO awarded WorleyParsons a study to check the adequacy of different compressor stations for the modified gas production profile resulted in 100 MBD FEED.
• Developed the adequacy checking methodology.
• Simulated the Gas compressor platforms (4 numbers in total) including GG-II, GPF, GIP & CGIP including Hydrocarbon dew point control unit and condensate handling system i.e. Condensate Stripper.
• Inputs to the study report.
• Performed necessary calculations.
 ADMA OPCO 100 MBSPD Project
• Worley Parsons is awarded a FEED to modify existing Zakum West Super Complex (ZWSC) facility to handle additional 100 MSTBPD crude from Thamama IV & Thamama V.
• Performed simulation of ZWSC platform using HYSYS
• Carried out gas / oil pipeline hydraulics using PIPESIM
• Line / Relief Valve / Control Valve sizing and prepared calculation dossier
• Sized the pump for new service
• Report writing
• HYSYS simulation & PIPESIM hydraulic reports writing
• Developed the PFD & P&ID
• Prepared Data sheets of equipments
• Prepared Heat & Material Balance
 BANA GAS Well Head Compression
• Bahrain National Gas Company (BANAGAS) had appointed Worleyparsons (WP) to initiate a pipeline network evaluation and compression study.
• Developed PFD & P&ID
• Prepared Heat & Material Balance
• Developed the Relief system model using FLARENET for adequacy check.
 DOLPHIN ENERGY GAS PIPELINE
• Prepared HYSYS Simulation and extracted Heat & Material balance
• Carried out control valve and relief valve sizing calculations

Presson Descon Intl. Pvt. Limited Lahore, Pakistan
Process Engineer October 2007 – July 2008

 Worked as a process engineer on onshore gas processing plants & supply jobs.
 MEHAR Field Development Project
• Prepared HYSYS Simulation and extracted Heat & Material balance
• Carried out control valve and relief valve sizing calculations
• Developed PFDs & P&IDs
• Prepared RFQs for the vendors
• Estimated mandatory utilities i.e. Instrument air, Hot Oil, Fuel gas etc
• Prepared Data sheets of equipments
 Kunnar Pasakai Deep Development Project (KPD)
• Revalidation of FEED documents of 300 MMSCFD KPD project owned by OGDCL
• Used HYSYS to simulate the plant including Amine Sweetening, Glycol Dehydration & Condensate Stabilization Unit.
• Carried out control valve and relief valve sizing calculations
• Developed PFDs & P&IDs
• Prepared RFQs for the vendors
• Estimated mandatory utilities i.e. Instrument air, Hot Oil, Fuel gas etc
• Prepared Data sheets of equipments
 SINJHORO Field Development Project
• Prepared HYSYS Simulation and extracted Heat & M...

Login or Register to view the full resume.